Erate
SFA Erate 2026 2027 RFP Cat2 - FAQ
SFA Erate 2026 2027 RFP Cat2 Attendum 1 - Jan 5, 2026
1. Preferred make and model (or equivalent):
- Caching Server - no preference
- Wireless Access Points - Ubiquiti preferred
- UPS (Uninterruptible Power Supply) - no preference
SFA Erate 2026 2027 RFP Cat2 P2 Attendum 1 - March 30th, 2026
- Do you have model(s) in mind for the requested 5 Cisco switches?
3 Cisco Catalyst 9200L 48 POE+ 4X10G or similar
2 USW-Pro-Aggregation Switches 24-port
2. Do you need transceivers and/or DAC cables for the requested switches?
Yes, we'll need both.
3. How many uplink ports do you need per switch?
2-4 uplink ports
4. Do you need to stack switches?
Yes stackable switches preferred.
5. Please, provide model number(s) for the switches you are requesting licenses for, or part numbers for the licenses themselves.
Cisco Catalyst 9200L 48 POE+ 4X10G (15)